SN

Name of Project

1 Redisigning, Rehabilitation and Upgradation to four lane configuration and Strengthing of UP/Haryana Border – Sonipat – Rohtak Jhajjar (from km 0.000 to km 80.250) section of new NH-334B in the state of Haryana on HAM basis under NH (o) Pkg-2
2 Upgradation to 2-lane with paved shoulder of Khajauwala-Poogal section and poogal – Dantaur – Jaggasar – Gokul – Gddu – Ranjeetpura – Charanwala – Naukh – Bap Section of NH-911 on HAM
3 Walayar Vadakkancherry Section in Kerala (Km 182.250 to Km 240.000 of NH-47) – Package NS-2/BOT/KL-2 in the State of Kerala
4 Four laning of  with Lucknow – Raebareli Section from  Km 12.700 to Km 82.700 (Design Chainage) of NH-24 B in the State of  Uttar Pradesh Under NHDP Phase IVB on DBFOT (Annuity)  Basis”,
5 Six Laning of NH-140 from Chittoor (Design Km 0.000/Existing Km. 158.000 of NH-4) to Mallvaram (Design Km 61.128 /Existing Km 41.800 of NH-140) (Design Length =61.128 Km) in the State of Andhra Pradesh under Bharatmala Praiyojana on Hybrid Annuity Mode ” (Name of Project)
6 Two Laning with Paved Shoulder of Meensurutti (Km 98.433) to Chidambaram (Km 129.965) Section of NH-227 under Bhartmala Pariyojana, Phase I (Residual Project under NHDP) in the state of Tamil Nadu
7 30Mw Solar Ground Mounted Project at Lingashetty Halli & Huyidore Village,Sia Tik,Tumkur Dst. Karnataka  on DBFOT
8 5Mw Solar Ground Mounted Project at No.391/1,390/3c,390/3a,391/2a,380/3,390/2A,390/1,390/3b,380/3,390/2b,388/1d of Puliamarathukottai Village,Vedachandhur Tik,Dindigul Dst,TN
9 Design & Build Contract for Development of proposed Airport at Durgapur phase- 1(A), (B) and (C) on PPP
10 Four- Laning of Ludhiana to Talwandi Section of NH-95 from km 92.00 to km 170.00 (Length-78.00 km) in the state of Punjab to be executed on BOT (Toll) under NHDP Phase III on DBFOT Bais”
11 Rajasmand-Bhilwara-Ganapur-Bhilwara Section of NH-758 (from km 0.000 to km 87.250) in the State of Rajasthan under NHDP Phase IV on BDFOT basis